|
Feb 21, 2025
|
|
|
|
2019-2020 Undergraduate Catalog ARCHIVED CATALOG: CONTENT MAY NOT BE CURRENT. USE THE DROP DOWN ABOVE TO ACCESS THE CURRENT CATALOG.
|
CEM 453/453L - Construction Scheduling Scheduling and resource optimization. Includes short-interval scheduling, Gantt charts, linear, and matrix scheduling formats. Network techniques including CPM and PERT concepts and calculations. Computer applications.
Credits: 3 Corequisites: . Prerequisites: Advanced Standing required.
|
|