| |
Mar 14, 2026
|
|
|
|
|
2008-2010 Undergraduate Catalog ARCHIVED CATALOG: CONTENT MAY NOT BE CURRENT. USE THE DROP DOWN ABOVE TO ACCESS THE CURRENT CATALOG.
|
CEM 451L - Construction Estimating Methods and techniques used in estimating construction costs. Standard approach to quantity surveys emphasized. Practice in takeoffs, costing, and final bidding preparation. Microcomputer usage for semester project.
Credits 3 Corequisites CEM 454 Prerequisites CEM 253, EGG 307 Lab/Lecture/Studio Hours Two hours lecture and three hours laboratory.
|
|