|
Jul 07, 2024
|
|
|
|
2024-2025 Undergraduate Catalog
|
CEM 452 - Construction Cost Control
Construction cost management including productivity and cost reporting/analysis concepts. Financial/cost issues/cash flow for the construction firm including reporting methods with percentage of completion techniques. Performance/profitability enhancement. Earned value management. Construction bonding and insurance issues. Firm and jobsite analysis. Case studies.
Credits: 3 Prerequisites: , . Prerequisites must be completed with a grade of C or better. Advanced Standing required. The maximum number of attempts for this course is three, including earned grades, withdrawals, and audits.
|
|