CEM 452/452L - Construction Cost Control Construction cost management including productivity and cost reporting/analysis concepts. Financial/cost issues/cash flow for the construction firm including reporting methods with percentage of completion techniques. Performance/profitability enhancement. Earned value management. Construction bonding and insurance issues. Firm and jobsite analysis. Case studies.
Credits: 3 Prerequisites: , . Prerequisites must be completed with a grade of C or better. Advanced Standing required. Lab/Lecture/Studio Hours: Two hours lecture and three hours laboratory.
|
|