CEM 452/452L - Construction Cost Control


Construction cost management including productivity and cost reporting/analysis concepts. Financial/cost issues/cash flow for the construction firm including reporting methods with percentage of completion techniques. Performance/profitability enhancement. Earned value management. Construction bonding and insurance issues. Firm and jobsite analysis. Case studies.

Credits: 3
Prerequisites:  ,  . Prerequisites must be completed with a grade of C or better. Advanced Standing required.
Lab/Lecture/Studio Hours: Two hours lecture and three hours laboratory.